Triple

T5487289
Position Surface form Disambiguated ID Type / Status
Subject Eastern Interconnection E123613 entity
Predicate interconnectionStandard P33787 FINISHED
Object NERC reliability standards LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NERC reliability standards | Statement: [Eastern Interconnection, interconnectionStandard, NERC reliability standards]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: interconnectionStandard
Context triple: [Eastern Interconnection, interconnectionStandard, NERC reliability standards]
  • A. interconnectTechnology
    Indicates a relationship where different technologies are linked or integrated so they can work together or share information.
  • B. interoperabilityStandard chosen
    Indicates that there is a standard or specification enabling different systems, components, or technologies to work together and exchange information seamlessly.
  • C. energyEfficientEthernetStandard
    Indicates that the subject conforms to or supports the Energy-Efficient Ethernet (EEE) standard for reducing power consumption in Ethernet networking.
  • D. connectorTypeDesignation
    Indicates the specific type or classification assigned to a connector within a connection or interface relationship.
  • E. switchingFabric
    Indicates a relationship where data traffic is routed or switched between multiple endpoints through an intermediate switching infrastructure.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd464a2d908190869324ce176779c8 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd93e5d0f08190a6cc9fc408b7c5bb completed March 20, 2026, 6:37 p.m.
PD Predicate disambiguation batch_69bd91a73b148190a865243536a4fe76 completed March 20, 2026, 6:27 p.m.
Created at: March 20, 2026, 2:10 p.m.