Triple

T5487249
Position Surface form Disambiguated ID Type / Status
Subject Eastern Interconnection E123613 entity
Predicate instanceOf P0 FINISHED
Object interconnected power system C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interconnected power system
Context triple: [Eastern Interconnection, instanceOf, interconnected power system]
  • A. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • B. balance of power system
    A balance of power system is an international relations arrangement in which states form shifting alliances and counterweights so that no single actor becomes dominant enough to threaten the independence or security of the others.
  • C. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • D. energy hub
    An energy hub is a centralized system or facility that integrates, converts, stores, and distributes multiple forms of energy (such as electricity, heat, and fuels) to optimize efficiency, reliability, and sustainability across connected users and infrastructures.
  • E. energy storage system
    An energy storage system is a device or group of devices that capture, store, and release energy for later use to improve reliability, efficiency, and flexibility of power supply.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd464a2d908190869324ce176779c8 completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 2:10 p.m.