Triple

T5457032
Position Surface form Disambiguated ID Type / Status
Subject RATTLR electric delivery van E122503 entity
Predicate instanceOf P0 FINISHED
Object electric delivery van C17488 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electric delivery van
Context triple: [RATTLR electric delivery van, instanceOf, electric delivery van]
  • A. electric semi-truck
    An electric semi-truck is a heavy-duty commercial vehicle powered solely by electric batteries and motors, designed to haul large freight loads with reduced emissions and operating costs compared to diesel trucks.
  • B. electrified vehicle chosen
    An electrified vehicle is a mode of transportation that uses electricity, either fully or in combination with conventional fuels, to power its propulsion system.
  • C. cargo van
    A cargo van is a box-shaped, enclosed vehicle designed primarily for transporting goods, equipment, or tools, offering ample interior space and minimal passenger seating.
  • D. full-size van
    A full-size van is a large, boxy vehicle built on a robust chassis, designed primarily for carrying multiple passengers or substantial cargo with ample interior space and versatility.
  • E. passenger van
    A passenger van is a large motor vehicle designed to transport multiple people comfortably, typically featuring three or more rows of seating and ample interior space for occupants and their belongings.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46424248819085282ddf50a565f3 completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 2:08 p.m.