Triple

T545636
Position Surface form Disambiguated ID Type / Status
Subject RNAS Yeovilton E12726 entity
Predicate instanceOf P0 FINISHED
Object Royal Naval Air Station C2490 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Royal Naval Air Station
Context triple: [RNAS Yeovilton, instanceOf, Royal Naval Air Station]
  • A. Royal Navy destroyer
    A Royal Navy destroyer is a fast, maneuverable warship designed for fleet escort, anti-submarine, anti-air, and surface warfare operations within the United Kingdom’s naval forces.
  • B. naval air service chosen
    A naval air service is a military aviation branch responsible for operating aircraft and related support units in direct support of a nation's navy, including maritime patrol, fleet air defense, anti-submarine warfare, and carrier-based operations.
  • C. Royal Navy warship
    A Royal Navy warship is a commissioned naval vessel of the United Kingdom designed, armed, and operated for maritime defense, power projection, and support of national interests at sea.
  • D. Arethusa-class light cruiser
    The Arethusa-class light cruiser was a group of small, fast Royal Navy warships built in the early 20th century, designed primarily for fleet scouting, destroyer flotilla leadership, and protection of larger capital ships.
  • E. naval arsenal
    A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49334226c81908b0ea1689ef6aa3f completed March 1, 2026, 7:27 p.m.
Created at: March 1, 2026, 7:32 p.m.