Triple
T542612
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bengaluru |
E12663
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | information technology hub |
C26
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: information technology hub Context triple: [Bengaluru, instanceOf, information technology hub]
-
A.
information system
An information system is an organized combination of people, processes, data, and technology designed to collect, process, store, and distribute information to support decision-making and control in an organization.
-
B.
computer services company
A computer services company is an organization that provides technical expertise, support, and solutions related to computer systems, software, networks, and IT infrastructure for individuals or other businesses.
-
C.
internet infrastructure component
An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
-
D.
information technology pioneer
An information technology pioneer is an individual who significantly advances the development, application, or understanding of computing and digital technologies, often introducing groundbreaking concepts, systems, or practices that shape the evolution of the IT field.
-
E.
technology region
chosen
A technology region is a geographically defined area characterized by a high concentration of technology-related activities, infrastructure, companies, and talent that collectively drive innovation and economic growth.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49334226c81908b0ea1689ef6aa3f |
completed | March 1, 2026, 7:27 p.m. |
Created at: March 1, 2026, 7:32 p.m.