Triple
T5415290
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TheBus routes |
E121114
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bus route system |
C2519
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bus route system Context triple: [TheBus routes, instanceOf, bus route system]
-
A.
transportation route
chosen
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
B.
rail route
A rail route is a defined path or corridor along which trains operate between specified locations, following a scheduled sequence of stops and track segments.
-
C.
public transport information system
A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
-
D.
bus rapid transit line
A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
-
E.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd463a41cc8190b32ff5af2b96ca93 |
completed | March 20, 2026, 1:06 p.m. |
Created at: March 20, 2026, 2:05 p.m.