Triple
T5413495
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Delhi–Meerut Expressway |
E121066
|
entity |
| Predicate | urbanSegment |
P52196
|
FINISHED |
| Object | Delhi–Ghaziabad stretch |
E121066
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Ghaziabad stretch | Statement: [Delhi–Meerut Expressway, urbanSegment, Delhi–Ghaziabad stretch]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Delhi–Ghaziabad stretch Context triple: [Delhi–Meerut Expressway, urbanSegment, Delhi–Ghaziabad stretch]
-
A.
Delhi–Meerut Expressway
chosen
The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
-
B.
Delhi–Gurugram Expressway
The Delhi–Gurugram Expressway is a major high-speed corridor connecting Delhi with the city of Gurugram in Haryana, forming a key segment of India’s National Highway network and a primary gateway to the national capital.
-
C.
Yamuna Expressway
The Yamuna Expressway is a high-speed, six-lane toll road in northern India that connects Greater Noida with Agra, significantly reducing travel time between Delhi and the Taj Mahal region.
-
D.
Delhi–Jaipur highway corridor
The Delhi–Jaipur highway corridor is a major road link in northern India connecting the national capital region around Delhi with the city of Jaipur, facilitating significant commuter and freight traffic.
-
E.
Noida–Greater Noida Expressway
The Noida–Greater Noida Expressway is a major high-speed road corridor in the National Capital Region of India that connects the cities of Noida and Greater Noida and serves as a key route for commuters and commercial traffic.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: urbanSegment Context triple: [Delhi–Meerut Expressway, urbanSegment, Delhi–Ghaziabad stretch]
-
A.
urbanComponent
Indicates that something functions as a constituent part or element within an urban area or city system.
-
B.
urbanDistrictType
Indicates the classification of an urban district according to its specific type or category within an administrative or planning system.
-
C.
withinUrbanArea
Indicates that one entity is located inside the spatial boundaries of an urban area associated with another entity.
-
D.
isUrbanRoute
chosen
Indicates that a route is located within, passes through, or primarily serves an urban or metropolitan area.
-
E.
isUrbanNeighborhood
Indicates that a given area functions as a neighborhood located within an urban or city environment.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd463a41cc8190b32ff5af2b96ca93 |
completed | March 20, 2026, 1:06 p.m. |
| NER | Named-entity recognition | batch_69bd87bb3c0c81908711784bc865ff03 |
completed | March 20, 2026, 5:45 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69bf3aa3e1988190ac484c91022dc08b |
completed | March 22, 2026, 12:41 a.m. |
| PD | Predicate disambiguation | batch_69bd8467e6b48190b9eaa9de67072e06 |
completed | March 20, 2026, 5:31 p.m. |
Created at: March 20, 2026, 2:05 p.m.