Triple

T5413495
Position Surface form Disambiguated ID Type / Status
Subject Delhi–Meerut Expressway E121066 entity
Predicate urbanSegment P52196 FINISHED
Object Delhi–Ghaziabad stretch E121066 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Ghaziabad stretch | Statement: [Delhi–Meerut Expressway, urbanSegment, Delhi–Ghaziabad stretch]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Delhi–Ghaziabad stretch
Context triple: [Delhi–Meerut Expressway, urbanSegment, Delhi–Ghaziabad stretch]
  • A. Delhi–Meerut Expressway chosen
    The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
  • B. Delhi–Gurugram Expressway
    The Delhi–Gurugram Expressway is a major high-speed corridor connecting Delhi with the city of Gurugram in Haryana, forming a key segment of India’s National Highway network and a primary gateway to the national capital.
  • C. Yamuna Expressway
    The Yamuna Expressway is a high-speed, six-lane toll road in northern India that connects Greater Noida with Agra, significantly reducing travel time between Delhi and the Taj Mahal region.
  • D. Delhi–Jaipur highway corridor
    The Delhi–Jaipur highway corridor is a major road link in northern India connecting the national capital region around Delhi with the city of Jaipur, facilitating significant commuter and freight traffic.
  • E. Noida–Greater Noida Expressway
    The Noida–Greater Noida Expressway is a major high-speed road corridor in the National Capital Region of India that connects the cities of Noida and Greater Noida and serves as a key route for commuters and commercial traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: urbanSegment
Context triple: [Delhi–Meerut Expressway, urbanSegment, Delhi–Ghaziabad stretch]
  • A. urbanComponent
    Indicates that something functions as a constituent part or element within an urban area or city system.
  • B. urbanDistrictType
    Indicates the classification of an urban district according to its specific type or category within an administrative or planning system.
  • C. withinUrbanArea
    Indicates that one entity is located inside the spatial boundaries of an urban area associated with another entity.
  • D. isUrbanRoute chosen
    Indicates that a route is located within, passes through, or primarily serves an urban or metropolitan area.
  • E. isUrbanNeighborhood
    Indicates that a given area functions as a neighborhood located within an urban or city environment.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd463a41cc8190b32ff5af2b96ca93 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd87bb3c0c81908711784bc865ff03 completed March 20, 2026, 5:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf3aa3e1988190ac484c91022dc08b completed March 22, 2026, 12:41 a.m.
PD Predicate disambiguation batch_69bd8467e6b48190b9eaa9de67072e06 completed March 20, 2026, 5:31 p.m.
Created at: March 20, 2026, 2:05 p.m.