Triple

T5401971
Position Surface form Disambiguated ID Type / Status
Subject Seville Metro E120797 entity
Predicate rollingStock P1305 FINISHED
Object CAF Urbos trains E442346 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CAF Urbos trains | Statement: [Seville Metro, rollingStock, CAF Urbos trains]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CAF Urbos trains
Context triple: [Seville Metro, rollingStock, CAF Urbos trains]
  • A. CAF Urbos 3 trams chosen
    CAF Urbos 3 trams are modern low-floor light rail vehicles manufactured by CAF and used in urban tram and light rail systems worldwide.
  • B. Alstom Citadis tram
    The Alstom Citadis tram is a family of modern low-floor light rail vehicles widely used in urban tram networks around the world.
  • C. M5 metro trains
    M5 metro trains are a modern fleet of high-capacity, low-floor metro vehicles used on the Amsterdam Metro system, designed to improve comfort, accessibility, and efficiency.
  • D. Alstom Metropolis
    Alstom Metropolis is a family of modern, high-capacity metro trains manufactured by Alstom and used in urban rapid transit systems worldwide.
  • E. Milan municipal tramway system
    The Milan municipal tramway system is the extensive urban tram network serving Milan, Italy, known for its historic rolling stock and central role in the city’s public transportation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46391c0c81909fa484446732b6a3 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd8771b25c819080da247bc3164cd9 completed March 20, 2026, 5:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf3388c10481908235da34ef509d37 completed March 22, 2026, 12:10 a.m.
Created at: March 20, 2026, 2:04 p.m.