Triple
T5368713
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yamaha Motor Company |
E108792
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power equipment manufacturer |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power equipment manufacturer Context triple: [Yamaha Motor Company, instanceOf, power equipment manufacturer]
-
A.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
B.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
C.
diesel engine manufacturer
A diesel engine manufacturer is a company that designs, produces, and supplies diesel-powered engines for various applications such as vehicles, machinery, and industrial equipment.
-
D.
irrigation equipment manufacturer
An irrigation equipment manufacturer is a company that designs, produces, and supplies systems and components used to deliver water efficiently to agricultural, landscaping, or industrial areas.
-
E.
electric motor
An electric motor is a device that converts electrical energy into mechanical rotational energy through the interaction of magnetic fields and current-carrying conductors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd440c77948190aad2a5f39b7b80f5 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 2:02 p.m.