Triple

T5353845
Position Surface form Disambiguated ID Type / Status
Subject Bayswater Power Station E102641 entity
Predicate operatedBy P86 FINISHED
Object AGL Energy E446822 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: AGL Energy | Statement: [Bayswater Power Station, operatedBy, AGL Energy]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: AGL Energy
Context triple: [Bayswater Power Station, operatedBy, AGL Energy]
  • A. AGL Energy chosen
    AGL Energy is a major Australian energy company that generates and retails electricity and gas to residential, commercial, and industrial customers.
  • B. Vistra Corp
    Vistra Corp is a large U.S. integrated retail electricity and power generation company.
  • C. NRG Energy
    NRG Energy is a large American energy company that produces and sells electricity and related services to residential, commercial, and industrial customers.
  • D. Reliant Energy
    Reliant Energy is a U.S.-based retail electricity provider and energy company known for supplying power to residential and commercial customers, particularly in Texas.
  • E. Calpine Corporation
    Calpine Corporation is a major American power company specializing in natural gas-fired and geothermal electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d8f7248190b64c140734b5c9a8 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd86149774819084049a8785e3f2e0 completed March 20, 2026, 5:38 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf29193b6c8190bbf0854b4a766009 completed March 21, 2026, 11:26 p.m.
Created at: March 20, 2026, 2:01 p.m.