Triple

T5314907
Position Surface form Disambiguated ID Type / Status
Subject Lewis River E119122 entity
Predicate hydroelectricProjectOn P58561 FINISHED
Object Swift Dam E510436 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Swift Dam | Statement: [Lewis River, hydroelectricProjectOn, Swift Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Swift Dam
Context triple: [Lewis River, hydroelectricProjectOn, Swift Dam]
  • A. Swift Dam chosen
    Swift Dam is a hydroelectric dam on the Lewis River in Washington State that forms Swift Reservoir as part of the region’s power generation system.
  • B. Forge Dam
    Forge Dam is a popular recreational park and former industrial mill site along Porter Brook in Sheffield, England, known for its woodland walks, playground, and café.
  • C. Silver Lake Dam
    Silver Lake Dam is a hydroelectric and flood-control structure on Michigan’s Dead River that helps regulate water flow and levels in the surrounding region.
  • D. Palisade Dam
    Palisade Dam is an irrigation and water storage structure located on the Sevier River in central Utah, supporting local agriculture and recreation.
  • E. McClure Dam
    McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd446b57bc8190a513d2e6c40314f3 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd91aab9348190a373b30bb305f933 completed March 20, 2026, 6:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf4114c120819098c2fcc7d1357441 completed March 22, 2026, 1:08 a.m.
Created at: March 20, 2026, 1:54 p.m.