Triple

T5314905
Position Surface form Disambiguated ID Type / Status
Subject Lewis River E119122 entity
Predicate hydroelectricProjectOn P58561 FINISHED
Object Merwin Dam E516215 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Merwin Dam | Statement: [Lewis River, hydroelectricProjectOn, Merwin Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Merwin Dam
Context triple: [Lewis River, hydroelectricProjectOn, Merwin Dam]
  • A. Merwin Dam chosen
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • B. Fengman Dam
    Fengman Dam is a large hydroelectric gravity dam on the Songhua River in Jilin Province, China, known for its significant role in regional power generation and flood control.
  • C. McClure Dam
    McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
  • D. Wyman Dam
    Wyman Dam is a hydroelectric dam in Maine that impounds the Kennebec River to form Wyman Lake and generate power.
  • E. Wyman Dam
    Wyman Dam is a hydroelectric dam located on the Androscoggin River in Maine, used for power generation and river flow regulation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hydroelectricProjectOn
Context triple: [Lewis River, hydroelectricProjectOn, Merwin Dam]
  • A. isHydroelectricProjectOn chosen
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • B. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • C. hydroelectricStationCommissioned
    Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
  • D. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • E. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd446b57bc8190a513d2e6c40314f3 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd86f20f008190be7b5848af05f2b8 completed March 20, 2026, 5:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf3a8c43988190814e3b2cca509f15 completed March 22, 2026, 12:40 a.m.
PD Predicate disambiguation batch_69bd84534f9c8190bc19d4812060768d completed March 20, 2026, 5:30 p.m.
Created at: March 20, 2026, 1:54 p.m.