Triple

T530960
Position Surface form Disambiguated ID Type / Status
Subject Beijing Subway E12220 entity
Predicate hasLine P35 FINISHED
Object Line 7
Line 7 is an east–west rapid transit line of the Beijing Subway serving several central and southwestern districts of Beijing.
E67417 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 7 | Statement: [Beijing Subway, hasLine, Line 7]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 7
Context triple: [Beijing Subway, hasLine, Line 7]
  • A. Line 7
    Line 7 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • B. Line 8
    Line 8 is a route of Mexico City’s Metrobús bus rapid transit system, serving key corridors with dedicated lanes and station platforms.
  • C. Line 5
    Line 5 is a major north–south route of the Beijing Subway known for connecting key residential and commercial areas through the city center.
  • D. Line 5
    Line 5 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • E. Line 5
    Line 5 is one of the main lines of the Santiago Metro in Chile, running across several key districts and serving as a major east–west transit corridor in the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Line 7
Triple: [Beijing Subway, hasLine, Line 7]
Generated description
Line 7 is an east–west rapid transit line of the Beijing Subway serving several central and southwestern districts of Beijing.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Line 7
Target entity description: Line 7 is an east–west rapid transit line of the Beijing Subway serving several central and southwestern districts of Beijing.
  • A. Line 7
    Line 7 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • B. Line 8
    Line 8 is a route of Mexico City’s Metrobús bus rapid transit system, serving key corridors with dedicated lanes and station platforms.
  • C. Line 5
    Line 5 is one of the main lines of the Santiago Metro in Chile, running across several key districts and serving as a major east–west transit corridor in the city.
  • D. Line 5
    Line 5 is a major north–south route of the Beijing Subway known for connecting key residential and commercial areas through the city center.
  • E. Line 5
    Line 5 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4933208e88190891f5debab1b776d completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a494dda58c8190870305056838a2b2 completed March 1, 2026, 7:34 p.m.
NED1 Entity disambiguation (via context triple) batch_69a4c66d76588190864ac6a992c44545 completed March 1, 2026, 11:06 p.m.
NEDg Description generation batch_69a4c7d8ba3081909ae63cafc11ad6bb completed March 1, 2026, 11:12 p.m.
NED2 Entity disambiguation (via description) batch_69a4c83437ec8190a8b71e45357b4e32 completed March 1, 2026, 11:13 p.m.
Created at: March 1, 2026, 7:32 p.m.