Triple
T530682
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rail Safety Improvement Act of 2008 |
E12215
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail safety legislation |
C4226
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail safety legislation Context triple: [Rail Safety Improvement Act of 2008, instanceOf, rail safety legislation]
-
A.
rail transportation infrastructure
Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
-
B.
railway signaling system
A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
-
C.
rail accident
A rail accident is an unintended event involving trains or railway infrastructure that results in damage, disruption, injury, or loss of life.
-
D.
railway infrastructure element
A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
-
E.
rail transit
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4933208e88190891f5debab1b776d |
completed | March 1, 2026, 7:27 p.m. |
Created at: March 1, 2026, 7:32 p.m.