Triple
T528017
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lysgårdsbakken |
E10966
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ski jumping hill complex |
C242
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ski jumping hill complex Context triple: [Lysgårdsbakken, instanceOf, ski jumping hill complex]
-
A.
mountain
A mountain is a large natural elevation of the Earth's surface rising prominently above its surroundings, typically with steep sides and a significant height relative to nearby terrain.
-
B.
mountain pass
A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
-
C.
sports and recreation facility
chosen
A sports and recreation facility is a place designed and equipped for individuals or groups to engage in physical activities, sports, exercise, and leisure pursuits.
-
D.
alpine lake
An alpine lake is a high-altitude body of freshwater, typically formed by glacial activity, characterized by cold, clear water and surrounded by mountainous terrain.
-
E.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e84b16c4819088d284c47c3a7968 |
completed | Feb. 28, 2026, 1:06 p.m. |
Created at: Feb. 28, 2026, 1:12 p.m.