Triple

T526797
Position Surface form Disambiguated ID Type / Status
Subject Prescription Drug Take Back Program E10936 entity
Predicate instanceOf P0 FINISHED
Object drug disposal program C1257 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: drug disposal program
Context triple: [Prescription Drug Take Back Program, instanceOf, drug disposal program]
  • A. public employment program
    A public employment program is a government-initiated scheme that directly creates temporary or permanent jobs, typically in public works or community services, to reduce unemployment and support income for targeted populations.
  • B. federal government program
    A federal government program is an organized set of activities, services, or regulations funded and administered by the national government to achieve specific public policy goals.
  • C. domestic policy program
    A domestic policy program is a coordinated set of government actions and initiatives designed to address specific national issues and objectives within a country’s borders.
  • D. disaster
    A disaster is a sudden, disruptive event—natural or human-made—that causes significant harm to people, property, or the environment and overwhelms normal coping capacities.
  • E. hospital
    A hospital is a healthcare facility where medical professionals diagnose, treat, and care for patients using specialized equipment and services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e84b16c4819088d284c47c3a7968 completed Feb. 28, 2026, 1:06 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.