Triple

T52645
Position Surface form Disambiguated ID Type / Status
Subject Interface Message Processor E1033 entity
Predicate managedBy P86 FINISHED
Object BBN Network Operations Center E188 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: BBN Network Operations Center | Statement: [Interface Message Processor, managedBy, BBN Network Operations Center]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: BBN Network Operations Center
Context triple: [Interface Message Processor, managedBy, BBN Network Operations Center]
  • A. Bolt Beranek and Newman chosen
    Bolt Beranek and Newman was a pioneering American research and engineering firm best known for its foundational role in developing the ARPANET, a precursor to the modern internet.
  • B. The Hub
    The Hub is a well-known nickname for Boston, Massachusetts, reflecting its historical role as a central cultural, intellectual, and political center in the United States.
  • C. BEA
    BEA is a U.S. government agency that produces key economic statistics, including measures of national income, output, and growth.
  • D. Conley Terminal
    Conley Terminal is the primary container shipping facility serving the Port of Boston and New England’s maritime trade.
  • E. B Reactor
    B Reactor is the world’s first full-scale plutonium production reactor, built during the Manhattan Project at the Hanford Site in Washington State.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2480baefc81909951b14058479aa2 completed Feb. 28, 2026, 1:42 a.m.
NER Named-entity recognition batch_69a24b0382b48190a7ca80ade6d2e270 completed Feb. 28, 2026, 1:55 a.m.
NED1 Entity disambiguation (via context triple) batch_69a25ab66dd0819081443ebc4702d3b0 completed Feb. 28, 2026, 3:02 a.m.
Created at: Feb. 28, 2026, 1:47 a.m.