Triple

T5260041
Position Surface form Disambiguated ID Type / Status
Subject Two Micron All Sky Survey E118799 entity
Predicate successorSurvey P50932 FINISHED
Object UKIDSS
UKIDSS (UKIRT Infrared Deep Sky Survey) is a major near-infrared sky survey conducted with the UK Infrared Telescope, designed to be deeper and wider than earlier infrared surveys.
E506498 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: UKIDSS | Statement: [Two Micron All Sky Survey, successorSurvey, UKIDSS]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: UKIDSS
Context triple: [Two Micron All Sky Survey, successorSurvey, UKIDSS]
  • A. UNDSS
    UNDSS is the United Nations department responsible for providing leadership, operational support, and oversight of the UN’s security management system to ensure the safety and security of UN personnel and operations worldwide.
  • B. Palomar Transient Factory
    The Palomar Transient Factory is an astronomical survey project that used the Palomar Observatory to systematically search the night sky for transient and variable phenomena such as supernovae and other short-lived cosmic events.
  • C. Two Micron All Sky Survey
    The Two Micron All Sky Survey (2MASS) is an astronomical survey that mapped the entire sky in near-infrared wavelengths, producing a comprehensive catalog of stars, galaxies, and other celestial objects.
  • D. Carnegie-Spitzer-IMACS Survey
    The Carnegie-Spitzer-IMACS Survey is an astronomical research project that combines infrared observations from the Spitzer Space Telescope with optical spectroscopy from the IMACS instrument to study the formation and evolution of galaxies across cosmic time.
  • E. Sloan Digital Sky Survey
    The Sloan Digital Sky Survey is a major astronomical project that has created some of the most detailed three-dimensional maps of the universe using wide-field imaging and spectroscopy.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: UKIDSS
Triple: [Two Micron All Sky Survey, successorSurvey, UKIDSS]
Generated description
UKIDSS (UKIRT Infrared Deep Sky Survey) is a major near-infrared sky survey conducted with the UK Infrared Telescope, designed to be deeper and wider than earlier infrared surveys.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: UKIDSS
Target entity description: UKIDSS (UKIRT Infrared Deep Sky Survey) is a major near-infrared sky survey conducted with the UK Infrared Telescope, designed to be deeper and wider than earlier infrared surveys.
  • A. UNDSS
    UNDSS is the United Nations department responsible for providing leadership, operational support, and oversight of the UN’s security management system to ensure the safety and security of UN personnel and operations worldwide.
  • B. Palomar Transient Factory
    The Palomar Transient Factory is an astronomical survey project that used the Palomar Observatory to systematically search the night sky for transient and variable phenomena such as supernovae and other short-lived cosmic events.
  • C. Two Micron All Sky Survey
    The Two Micron All Sky Survey (2MASS) is an astronomical survey that mapped the entire sky in near-infrared wavelengths, producing a comprehensive catalog of stars, galaxies, and other celestial objects.
  • D. Carnegie-Spitzer-IMACS Survey
    The Carnegie-Spitzer-IMACS Survey is an astronomical research project that combines infrared observations from the Spitzer Space Telescope with optical spectroscopy from the IMACS instrument to study the formation and evolution of galaxies across cosmic time.
  • E. Sloan Digital Sky Survey
    The Sloan Digital Sky Survey is a major astronomical project that has created some of the most detailed three-dimensional maps of the universe using wide-field imaging and spectroscopy.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: successorSurvey
Context triple: [Two Micron All Sky Survey, successorSurvey, UKIDSS]
  • A. successor
    Indicates that one entity directly follows another in an ordered sequence or position.
  • B. successorCampaign
    Indicates that one campaign directly follows and continues or replaces another campaign in sequence.
  • C. successorInPractice
    Indicates that one entity has taken over the role, position, or function of another in actual practice, even if not formally or officially designated as its successor.
  • D. successorSystem chosen
    Indicates that one system directly follows and replaces another in function, role, or version.
  • E. successorSee
    Indicates that one entity assumes or continues the role, position, or function previously held by another.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd446a42c88190b7ecbef006561d55 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd7bcced6881909bdb7ac5471a37fe completed March 20, 2026, 4:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69befe821e3c8190a03c8aa581cc23cf completed March 21, 2026, 8:24 p.m.
NEDg Description generation batch_69beff56b42881909ff4f574ef87b693 completed March 21, 2026, 8:28 p.m.
NED2 Entity disambiguation (via description) batch_69bf00120fe88190817badb72977566e completed March 21, 2026, 8:31 p.m.
PD Predicate disambiguation batch_69bd77c55224819096c0bcfcfae79bd3 completed March 20, 2026, 4:37 p.m.
Created at: March 20, 2026, 1:50 p.m.