Triple

T525652
Position Surface form Disambiguated ID Type / Status
Subject Tramway T7 E10911 entity
Predicate instanceOf P0 FINISHED
Object tramway line C910 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tramway line
Context triple: [Tramway T7, instanceOf, tramway line]
  • A. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • B. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • C. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • D. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • E. streetcar system chosen
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e84b16c4819088d284c47c3a7968 completed Feb. 28, 2026, 1:06 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.