Triple

T524305
Position Surface form Disambiguated ID Type / Status
Subject Empire State of Mind (Part II) Broken Down E10883 entity
Predicate composer P1361 FINISHED
Object Fredricka G. Ross E164918 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fredricka G. Ross | Statement: [Empire State of Mind (Part II) Broken Down, composer, Fredricka G. Ross]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fredricka G. Ross
Context triple: [Empire State of Mind (Part II) Broken Down, composer, Fredricka G. Ross]
  • A. Fredricka G. Ross chosen
    Fredricka G. Ross is a songwriter best known for co-writing the lyrics to Alicia Keys’ hit ballad “Empire State of Mind (Part II) Broken Down.”
  • B. Dolores H. Russ
    Dolores H. Russ was an American philanthropist and co-namesake of the prestigious Fritz J. and Dolores H. Russ Prize in engineering.
  • C. Emma T. Townsend
    Emma T. Townsend was the wife of prominent American steel industry magnate and U.S. Steel co-founder Elbert H. Gary.
  • D. Josephine Stovall
    Josephine Stovall was the wife of James V. Forrestal, the first United States Secretary of Defense.
  • E. Yvonne C. Brill
    Yvonne C. Brill was a pioneering Canadian-American rocket and jet propulsion engineer renowned for her innovations in satellite propulsion systems and advocacy for women in engineering.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e84b16c4819088d284c47c3a7968 completed Feb. 28, 2026, 1:06 p.m.
NER Named-entity recognition batch_69a2f1b656c08190b387f21b06d99e68 completed Feb. 28, 2026, 1:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69ad0e5413448190bd9112e2b3d83826 completed March 8, 2026, 5:51 a.m.
Created at: Feb. 28, 2026, 1:12 p.m.