Triple

T5224965
Position Surface form Disambiguated ID Type / Status
Subject STS-120 E117961 entity
Predicate followedByMission P34869 FINISHED
Object STS-122 E413565 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-122 | Statement: [STS-120, followedByMission, STS-122]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-122
Context triple: [STS-120, followedByMission, STS-122]
  • A. STS-122 chosen
    STS-122 was a 2008 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the European Space Agency’s Columbus laboratory module.
  • B. STS-112
    STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
  • C. STS-123
    STS-123 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2008 that delivered key components including Japan’s Kibo logistics module and the Canadian-built Dextre robotic system.
  • D. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • E. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4465e03081909bfcfd7113062590 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd7adb034c819086bf8a85fbf158f4 completed March 20, 2026, 4:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf1873a8608190b07f1152df8e2e5d completed March 21, 2026, 10:15 p.m.
Created at: March 20, 2026, 1:48 p.m.