Triple

T5223380
Position Surface form Disambiguated ID Type / Status
Subject Venetian Lagoon E117925 entity
Predicate floodProtectionProject P7637 FINISHED
Object MOSE Project E122310 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MOSE Project | Statement: [Venetian Lagoon, floodProtectionProject, MOSE Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MOSE Project
Context triple: [Venetian Lagoon, floodProtectionProject, MOSE Project]
  • A. MOSE flood barrier system chosen
    The MOSE flood barrier system is a large-scale engineering project of movable gates designed to protect Venice and its lagoon from high tides and flooding.
  • B. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • C. Yakima Project
    The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
  • D. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • E. Grand Inga Dam Project
    The Grand Inga Dam Project is an ambitious proposed hydroelectric megaproject on the Congo River in the Democratic Republic of the Congo, intended to become the world’s largest power station and a key driver of regional energy integration and development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: floodProtectionProject
Context triple: [Venetian Lagoon, floodProtectionProject, MOSE Project]
  • A. floodResistanceDesign
    Indicates that something is designed or engineered to withstand, mitigate, or remain functional during flooding conditions.
  • B. hasFloodProtectionProject chosen
    Indicates that a flood protection project exists or is implemented for the referenced entity.
  • C. hasFloodProtectionInfrastructure
    Indicates that there exists built or implemented infrastructure designed to protect against or mitigate flooding for the referenced entity.
  • D. coastalProtection
    Indicates measures or actions taken to preserve, defend, or stabilize coastal areas against erosion, flooding, or other marine-related impacts.
  • E. floodEvent
    Indicates an occurrence of a flooding event affecting a location, time period, or set of impacted entities.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4465e03081909bfcfd7113062590 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd7abba82881908c030ba55146b8ea completed March 20, 2026, 4:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69beeff852bc81908467a343c5ded404 completed March 21, 2026, 7:22 p.m.
PD Predicate disambiguation batch_69bd77bd2a448190a9ae5afd2585a7b9 completed March 20, 2026, 4:37 p.m.
Created at: March 20, 2026, 1:48 p.m.