Triple
T5190489
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cape May Seashore Lines |
E117140
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | passenger railroad operator |
C9409
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: passenger railroad operator Context triple: [Cape May Seashore Lines, instanceOf, passenger railroad operator]
-
A.
rail transport company
chosen
A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
-
B.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
C.
freight railroad company
A freight railroad company is an organization that owns or operates rail infrastructure and rolling stock to transport goods and commodities by train between industrial, commercial, and logistics locations.
-
D.
common carrier railroad
A common carrier railroad is a rail transport company that offers freight and/or passenger services to the general public under legal obligation to serve all customers without discrimination, according to published rates and schedules.
-
E.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd44620ff48190bcac01782107a397 |
completed | March 20, 2026, 12:58 p.m. |
Created at: March 20, 2026, 1:46 p.m.