Triple

T5135261
Position Surface form Disambiguated ID Type / Status
Subject Hudson and Manhattan Railroad E115803 entity
Predicate instanceOf P0 FINISHED
Object interurban railroad C17649 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interurban railroad
Context triple: [Hudson and Manhattan Railroad, instanceOf, interurban railroad]
  • A. suburban commuter train
    A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
  • B. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • C. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • D. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • E. tram line
    A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd44459a988190a772a5c2ec6a1965 completed March 20, 2026, 12:57 p.m.
Created at: March 20, 2026, 1:43 p.m.