Triple

T509433
Position Surface form Disambiguated ID Type / Status
Subject Yankee Stadium E10572 entity
Predicate architect P184 FINISHED
Object HOK Sport E27534 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: HOK Sport | Statement: [Yankee Stadium, architect, HOK Sport]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: HOK Sport
Context triple: [Yankee Stadium, architect, HOK Sport]
  • A. HOK Group
    HOK Group is a global design, architecture, engineering, and planning firm known for large-scale commercial, civic, and sports projects.
  • B. Skidmore, Owings & Merrill
    Skidmore, Owings & Merrill is a prominent American architecture and engineering firm renowned for designing major modernist and high-rise buildings worldwide.
  • C. HOK Sport Venue Event chosen
    HOK Sport Venue Event was the original name of the architectural firm now known as Populous, renowned for designing major sports stadiums and entertainment venues worldwide.
  • D. HKS, Inc.
    HKS, Inc. is a global architecture firm known for designing major sports, entertainment, and commercial venues.
  • E. Ellerbe Becket
    Ellerbe Becket is a major American architectural and engineering firm known for designing large-scale sports, entertainment, and public assembly venues worldwide.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e848adf881908e5e04f7af030093 completed Feb. 28, 2026, 1:06 p.m.
NER Named-entity recognition batch_69a2f164a9d48190b525a97b5c06ffe2 completed Feb. 28, 2026, 1:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69a49851b80081908375bb72d2d89ab0 completed March 1, 2026, 7:49 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.