Triple
T5084762
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Park Drive loop road |
E114608
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Prospect Park circulation system
The Prospect Park circulation system is the integrated network of roads, paths, and trails in Brooklyn’s Prospect Park designed to manage and separate pedestrian, bicycle, and vehicular movement throughout the park.
|
E492124
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Prospect Park circulation system | Statement: [Park Drive loop road, partOf, Prospect Park circulation system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Prospect Park circulation system Context triple: [Park Drive loop road, partOf, Prospect Park circulation system]
-
A.
Manhattan Waterfront Greenway
The Manhattan Waterfront Greenway is a continuous 32-mile shared-use path encircling Manhattan, providing cyclists and pedestrians with scenic access to the island’s riverside parks and shoreline.
-
B.
Harlem River Greenway
Harlem River Greenway is a waterfront pedestrian and bicycle path in Manhattan that runs along the Harlem River, connecting parks and neighborhoods as part of New York City’s larger greenway network.
-
C.
Prospect Park Lakeside development
Prospect Park Lakeside development is a major revitalization and recreation project on the southeast shore of Brooklyn’s Prospect Park that includes new skating rinks, lakeside access, and landscaped public spaces.
-
D.
Brooklyn Waterfront Greenway
Brooklyn Waterfront Greenway is a multi-use pedestrian and bicycle route that runs along Brooklyn’s shoreline, connecting parks, neighborhoods, and waterfront destinations.
-
E.
Brooklyn Bridge Park
Brooklyn Bridge Park is a waterfront public park in Brooklyn, New York City, known for its recreational spaces, scenic views of the Manhattan skyline and Brooklyn Bridge, and revitalized piers along the East River.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Prospect Park circulation system Triple: [Park Drive loop road, partOf, Prospect Park circulation system]
Generated description
The Prospect Park circulation system is the integrated network of roads, paths, and trails in Brooklyn’s Prospect Park designed to manage and separate pedestrian, bicycle, and vehicular movement throughout the park.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Prospect Park circulation system Target entity description: The Prospect Park circulation system is the integrated network of roads, paths, and trails in Brooklyn’s Prospect Park designed to manage and separate pedestrian, bicycle, and vehicular movement throughout the park.
-
A.
Manhattan Waterfront Greenway
The Manhattan Waterfront Greenway is a continuous 32-mile shared-use path encircling Manhattan, providing cyclists and pedestrians with scenic access to the island’s riverside parks and shoreline.
-
B.
Harlem River Greenway
Harlem River Greenway is a waterfront pedestrian and bicycle path in Manhattan that runs along the Harlem River, connecting parks and neighborhoods as part of New York City’s larger greenway network.
-
C.
Prospect Park Lakeside development
Prospect Park Lakeside development is a major revitalization and recreation project on the southeast shore of Brooklyn’s Prospect Park that includes new skating rinks, lakeside access, and landscaped public spaces.
-
D.
Brooklyn Waterfront Greenway
Brooklyn Waterfront Greenway is a multi-use pedestrian and bicycle route that runs along Brooklyn’s shoreline, connecting parks, neighborhoods, and waterfront destinations.
-
E.
Brooklyn Bridge Park
Brooklyn Bridge Park is a waterfront public park in Brooklyn, New York City, known for its recreational spaces, scenic views of the Manhattan skyline and Brooklyn Bridge, and revitalized piers along the East River.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd443e941881908eb4e8c685b6f656 |
completed | March 20, 2026, 12:57 p.m. |
| NER | Named-entity recognition | batch_69bd75192d188190a7631bce5faf7de3 |
completed | March 20, 2026, 4:26 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69beb13a8be08190a0f1fc3aec224dde |
completed | March 21, 2026, 2:54 p.m. |
| NEDg | Description generation | batch_69beb22ca4148190b599b48c05e5e3da |
completed | March 21, 2026, 2:58 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69beb2c80a6881908ad29936da1240d2 |
completed | March 21, 2026, 3:01 p.m. |
Created at: March 20, 2026, 1:40 p.m.