Triple

T5018155
Position Surface form Disambiguated ID Type / Status
Subject Roku (regional offices) E112783 entity
Predicate instanceOf P0 FINISHED
Object corporate office network C16829 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: corporate office network
Context triple: [Roku (regional offices), instanceOf, corporate office network]
  • A. network operations facility
    A network operations facility is a centralized, secure environment where personnel and systems monitor, manage, and maintain an organization’s communication networks and related infrastructure to ensure reliable, efficient, and secure operations.
  • B. global computer network
    A global computer network is a worldwide system of interconnected computers and devices that communicate using standardized protocols to share data and resources across vast distances.
  • C. networking hardware company
    A networking hardware company designs, manufactures, and sells physical devices and infrastructure that enable data communication and connectivity across computer networks.
  • D. public office
    A public office is an official position of authority and responsibility within a government or public institution, held to serve the interests and welfare of the public under established laws and regulations.
  • E. manufacturing network
    A manufacturing network is an interconnected system of facilities, suppliers, technologies, and logistics that collaboratively plan, produce, and distribute goods across multiple locations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4435c2f48190be593158cbfcf8a3 completed March 20, 2026, 12:57 p.m.
Created at: March 20, 2026, 1:35 p.m.