Triple

T4998796
Position Surface form Disambiguated ID Type / Status
Subject Zuidasdok infrastructure project E112314 entity
Predicate stakeholder P1553 FINISHED
Object ProRail E74236 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ProRail | Statement: [Zuidasdok infrastructure project, stakeholder, ProRail]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ProRail
Context triple: [Zuidasdok infrastructure project, stakeholder, ProRail]
  • A. ProRail chosen
    ProRail is the Dutch government-owned company responsible for managing and maintaining the national railway infrastructure in the Netherlands.
  • B. Nederlandse Spoorwegen
    Nederlandse Spoorwegen is the principal Dutch railway company responsible for most passenger train services across the Netherlands.
  • C. SNCB/NMBS
    SNCB/NMBS is the Belgian national railway company responsible for operating most passenger train services and managing much of the rail infrastructure in Belgium.
  • D. Amsterdam–Schiphol railway
    The Amsterdam–Schiphol railway is a key rail line in the Netherlands that connects central Amsterdam with Schiphol Airport and other major routes in the Randstad region.
  • E. Infrabel
    Infrabel is the Belgian railway infrastructure manager responsible for the construction, maintenance, and operation of the national rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4432b32c81909f3b3c6bd10f0653 completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd72bc100c81908c3e02726e1ef8f6 completed March 20, 2026, 4:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69becfaf46948190ae05ecab52da2e8d completed March 21, 2026, 5:04 p.m.
Created at: March 20, 2026, 1:34 p.m.