Triple

T4990669
Position Surface form Disambiguated ID Type / Status
Subject Madeira River E112120 entity
Predicate hasDam P8736 FINISHED
Object Jirau Dam
Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
E489144 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jirau Dam | Statement: [Madeira River, hasDam, Jirau Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jirau Dam
Context triple: [Madeira River, hasDam, Jirau Dam]
  • A. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • B. Lodoyo Dam
    Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • C. Mutirikwi Dam
    Mutirikwi Dam is a major concrete arch dam in southeastern Zimbabwe that creates Lake Mutirikwi and serves as an important source of irrigation water and hydroelectric power.
  • D. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • E. Manyame Dam
    Manyame Dam is a major reservoir in Zimbabwe that supplies water for irrigation, urban use, and hydroelectric power generation along the Manyame River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Jirau Dam
Triple: [Madeira River, hasDam, Jirau Dam]
Generated description
Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Jirau Dam
Target entity description: Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
  • A. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • B. Lodoyo Dam
    Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • C. Mutirikwi Dam
    Mutirikwi Dam is a major concrete arch dam in southeastern Zimbabwe that creates Lake Mutirikwi and serves as an important source of irrigation water and hydroelectric power.
  • D. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • E. Manyame Dam
    Manyame Dam is a major reservoir in Zimbabwe that supplies water for irrigation, urban use, and hydroelectric power generation along the Manyame River.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd441be7bc8190b530362d427b97d2 completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd728141d48190a0713e6d33c50fb6 completed March 20, 2026, 4:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69be9c51e6408190aba51a26efddbaff completed March 21, 2026, 1:25 p.m.
NEDg Description generation batch_69bea01dbc9c81909b2b68d9b6451355 completed March 21, 2026, 1:41 p.m.
NED2 Entity disambiguation (via description) batch_69bea0767b348190b5b8326fbc087dcf completed March 21, 2026, 1:43 p.m.
Created at: March 20, 2026, 1:34 p.m.