Triple

T496005
Position Surface form Disambiguated ID Type / Status
Subject Second Bank of the United States E10294 entity
Predicate finalFailure P4339 FINISHED
Object 1841 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1841 | Statement: [Second Bank of the United States, finalFailure, 1841]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalFailure
Context triple: [Second Bank of the United States, finalFailure, 1841]
  • A. missionFailure
    Indicates that an attempted mission or operation did not achieve its intended objectives or outcome.
  • B. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • C. finalDisposition chosen
    Indicates the ultimate outcome, status, or resolution assigned to an entity after all relevant processes or decisions are complete.
  • D. failsWhen
    Indicates that a particular action, process, or condition does not succeed under the specified circumstances or triggers.
  • E. fault
    Indicates that one entity is responsible or at blame for a problem, error, or undesirable outcome involving another entity or situation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e847df8481909239ec08ccf1e376 completed Feb. 28, 2026, 1:06 p.m.
NER Named-entity recognition batch_69a2f115334881908ac5ab96c7f4214e completed Feb. 28, 2026, 1:43 p.m.
PD Predicate disambiguation batch_69a2edf90ca88190b6a182e5b6733612 completed Feb. 28, 2026, 1:30 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.