Triple

T492188
Position Surface form Disambiguated ID Type / Status
Subject Urbanisme E10212 entity
Predicate instanceOf P0 FINISHED
Object urban planning book C2407 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban planning book
Context triple: [Urbanisme, instanceOf, urban planning book]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. city
    A city is a densely populated, structured urban area characterized by extensive infrastructure, diverse economic activities, and complex social, cultural, and political systems.
  • C. urban park
    An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
  • D. regional planning agency
    A regional planning agency is an organization responsible for coordinating land use, transportation, infrastructure, and environmental planning across multiple jurisdictions within a defined geographic region.
  • E. urban business district
    An urban business district is a densely developed area within a city characterized by a high concentration of offices, commercial activities, financial institutions, and supporting services that form the economic core of the urban environment.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e847df8481909239ec08ccf1e376 completed Feb. 28, 2026, 1:06 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.