Triple
T4909354
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Line 9 (Mexico City Metro) |
E110193
|
entity |
| Predicate | nativeName |
P15
|
FINISHED |
| Object | Línea 9 |
E282398
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Línea 9 | Statement: [Line 9 (Mexico City Metro), nativeName, Línea 9]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Línea 9 Context triple: [Line 9 (Mexico City Metro), nativeName, Línea 9]
-
A.
Línea 6
Línea 6 is a modern, fully automated metro line in Santiago, Chile, known for its advanced technology, safety features, and connection between key residential and commercial areas of the city.
-
B.
Metro Line 9
chosen
Metro Line 9 is a rapid transit line that forms part of the Mexico City Metro system, serving key neighborhoods and providing important transfer connections within the network.
-
C.
S9 line
The S9 line is a route of the Rhine-Main S-Bahn network serving the Frankfurt metropolitan area and connecting central Frankfurt with surrounding suburbs and regional destinations.
-
D.
Metro Line 54
Metro Line 54 is a rapid transit line in the Amsterdam Metro system that connects the city center with southeastern suburbs such as Bijlmermeer.
-
E.
Metro Line 7
Metro Line 7 is a rapid transit route in a metropolitan subway network that connects multiple key districts and serves as an interchange point with several other lines.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd44132b94819088522d92beaadc78 |
completed | March 20, 2026, 12:56 p.m. |
| NER | Named-entity recognition | batch_69bd6e99414081908c3d3283f563bba4 |
completed | March 20, 2026, 3:58 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69be6fe098b081908e17d6d349b76364 |
completed | March 21, 2026, 10:16 a.m. |
Created at: March 20, 2026, 1:29 p.m.