Triple

T490665
Position Surface form Disambiguated ID Type / Status
Subject Giant Magellan Telescope E9980 entity
Predicate projectStatus P127 FINISHED
Object under construction LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: under construction | Statement: [Giant Magellan Telescope, projectStatus, under construction]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: projectStatus
Context triple: [Giant Magellan Telescope, projectStatus, under construction]
  • A. overseesProject
    Indicates that one entity has responsibility for supervising, managing, or directing the progress and execution of a project involving another entity.
  • B. exportStatus
    Indicates the current state or outcome of an entity’s export process (e.g., pending, in progress, completed, or failed).
  • C. peakStatus
    Indicates the condition or phase of something at its highest or most intense point in its progression or lifecycle.
  • D. status chosen
    Indicates the current condition, state, or standing of an entity within a given context.
  • E. architecturalProject
    Indicates that one entity is an architectural project associated with, created by, or undertaken for another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e802e2908190ab17c9479e0b6412 completed Feb. 28, 2026, 1:05 p.m.
NER Named-entity recognition batch_69a2f0e22a308190b04d12974fd08a38 completed Feb. 28, 2026, 1:42 p.m.
PD Predicate disambiguation batch_69a2edf7ce008190836fb6ab5ea39375 completed Feb. 28, 2026, 1:30 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.