Triple

T488432
Position Surface form Disambiguated ID Type / Status
Subject Washington Metrorail Safety Commission E9931 entity
Predicate instanceOf P0 FINISHED
Object interstate compact commission C1091 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interstate compact commission
Context triple: [Washington Metrorail Safety Commission, instanceOf, interstate compact commission]
  • A. bi-state agency chosen
    A bi-state agency is a governmental or quasi-governmental organization jointly created and governed by two neighboring states to manage shared resources, infrastructure, or regulatory responsibilities across their common jurisdiction.
  • B. auxiliary Interstate Highway
    An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
  • C. three-digit Interstate Highway
    A three-digit Interstate Highway is an auxiliary route connected to a primary one- or two-digit Interstate, typically serving as a loop, spur, or bypass around or into urban areas.
  • D. Interstate Highway
    An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
  • E. state highway
    A state highway is a public road maintained and administered by a state government, forming part of a regional or statewide transportation network that connects cities, towns, and other major routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e802e2908190ab17c9479e0b6412 completed Feb. 28, 2026, 1:05 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.