Triple

T4840179
Position Surface form Disambiguated ID Type / Status
Subject Piers Sellers E108157 entity
Predicate spaceMission P68 FINISHED
Object STS-112
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
E474249 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-112 | Statement: [Piers Sellers, spaceMission, STS-112]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-112
Context triple: [Piers Sellers, spaceMission, STS-112]
  • A. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • B. STS-122
    STS-122 was a 2008 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the European Space Agency’s Columbus laboratory module.
  • C. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • D. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • E. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-112
Triple: [Piers Sellers, spaceMission, STS-112]
Generated description
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-112
Target entity description: STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
  • A. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • B. STS-122
    STS-122 was a 2008 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the European Space Agency’s Columbus laboratory module.
  • C. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • D. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • E. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43fbe444819085cb970706ef73f7 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd6cfbfbb08190b4580ebb2eb845b2 completed March 20, 2026, 3:51 p.m.
NED1 Entity disambiguation (via context triple) batch_69be5cca17d881909a58c84549633701 completed March 21, 2026, 8:54 a.m.
NEDg Description generation batch_69be5fc3972c8190bb6be7c16b785bb5 completed March 21, 2026, 9:07 a.m.
NED2 Entity disambiguation (via description) batch_69be60613bb48190bf7cbb7a8e671753 completed March 21, 2026, 9:09 a.m.
Created at: March 20, 2026, 1:25 p.m.