Triple

T481728
Position Surface form Disambiguated ID Type / Status
Subject 1967 Boston Red Sox "Impossible Dream" season E9181 entity
Predicate finalDayOutcome P4339 FINISHED
Object Red Sox defeated Twins to clinch pennant LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Red Sox defeated Twins to clinch pennant | Statement: [1967 Boston Red Sox "Impossible Dream" season, finalDayOutcome, Red Sox defeated Twins to clinch pennant]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalDayOutcome
Context triple: [1967 Boston Red Sox "Impossible Dream" season, finalDayOutcome, Red Sox defeated Twins to clinch pennant]
  • A. finalDisposition chosen
    Indicates the ultimate outcome, status, or resolution assigned to an entity after all relevant processes or decisions are complete.
  • B. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • C. resultDetermination
    Indicates the process or criteria by which an outcome, decision, or result is established or concluded from given inputs or conditions.
  • D. concludedAt
    Indicates the point in time at which an event, process, or relationship comes to an end or is completed.
  • E. finalScore
    Indicates the resulting or overall score achieved after all contributing actions, events, or evaluations are completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7ff81708190b0507a24a997232c completed Feb. 28, 2026, 1:05 p.m.
NER Named-entity recognition batch_69a2f05a7f6c819082b4a5a3e69468a6 completed Feb. 28, 2026, 1:40 p.m.
PD Predicate disambiguation batch_69a2edf321288190b5d560f75782c2cb completed Feb. 28, 2026, 1:30 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.