Triple

T478599
Position Surface form Disambiguated ID Type / Status
Subject Santiago Metro E9115 entity
Predicate hasLine P35 FINISHED
Object Line 5
Line 5 is one of the main lines of the Santiago Metro in Chile, running across several key districts and serving as a major east–west transit corridor in the city.
E61190 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 5 | Statement: [Santiago Metro, hasLine, Line 5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 5
Context triple: [Santiago Metro, hasLine, Line 5]
  • A. Line 5
    Line 5 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • B. Line 4
    Line 4 is a major line of the Santiago Metro in Chile, serving key residential and commercial areas in the southeastern part of the city.
  • C. Line 4
    Line 4 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • D. Line 7
    Line 7 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • E. Line 3
    Line 3 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Line 5
Triple: [Santiago Metro, hasLine, Line 5]
Generated description
Line 5 is one of the main lines of the Santiago Metro in Chile, running across several key districts and serving as a major east–west transit corridor in the city.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Line 5
Target entity description: Line 5 is one of the main lines of the Santiago Metro in Chile, running across several key districts and serving as a major east–west transit corridor in the city.
  • A. Line 5
    Line 5 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • B. Line 4
    Line 4 is a major line of the Santiago Metro in Chile, serving key residential and commercial areas in the southeastern part of the city.
  • C. Line 4
    Line 4 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • D. Line 7
    Line 7 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • E. Line 3
    Line 3 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7ff81708190b0507a24a997232c completed Feb. 28, 2026, 1:05 p.m.
NER Named-entity recognition batch_69a2f056459881909749764cc4a7f9e8 completed Feb. 28, 2026, 1:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69a4777d131c8190a9e6dea9fef49486 completed March 1, 2026, 5:29 p.m.
NEDg Description generation batch_69a477e9a9ec8190a30ae1466aad9108 completed March 1, 2026, 5:31 p.m.
NED2 Entity disambiguation (via description) batch_69a4785561b88190954c78f96e2d4b44 completed March 1, 2026, 5:33 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.