Triple

T477057
Position Surface form Disambiguated ID Type / Status
Subject Ministry of Communications building E9084 entity
Predicate instanceOf P0 FINISHED
Object landmark building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: landmark building
Context triple: [Ministry of Communications building, instanceOf, landmark building]
  • A. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • B. government building
    A government building is a structure owned or used by a public authority to house offices, services, and functions related to the administration and governance of a city, region, or country.
  • C. obelisk
    An obelisk is a tall, four-sided, narrow tapering monument that ends in a pyramid-shaped top, typically carved from a single stone and often erected as a commemorative or ceremonial structure.
  • D. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • E. Beaux-Arts building
    A Beaux-Arts building is a grand, formally composed structure characterized by classical symmetry, rich ornamentation, and monumental scale, reflecting the academic architectural principles of the École des Beaux-Arts in Paris.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7ff81708190b0507a24a997232c completed Feb. 28, 2026, 1:05 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.