Triple

T4760455
Position Surface form Disambiguated ID Type / Status
Subject Leningrad Codex E105685 entity
Predicate completeness P26754 FINISHED
Object complete Hebrew Bible LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: complete Hebrew Bible | Statement: [Leningrad Codex, completeness, complete Hebrew Bible]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: completeness
Context triple: [Leningrad Codex, completeness, complete Hebrew Bible]
  • A. isIncompletenessSubjectTo
    Indicates that an incompleteness, deficiency, or lack in something is governed, constrained, or determined by a particular condition, rule, or authority.
  • B. isComplete
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • C. closureCompleted
    Indicates that a previously initiated closure process or shutdown has been fully and successfully completed.
  • D. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • E. inscriptionCompleteness chosen
    Indicates how fully or partially an inscription is preserved or recorded in relation to its original state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f14cac819081c7c69803648211 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd650dc7fc81909b483ef3c456ae0d completed March 20, 2026, 3:17 p.m.
PD Predicate disambiguation batch_69bd6225c9488190afee5bb3619d0365 completed March 20, 2026, 3:05 p.m.
Created at: March 20, 2026, 1:20 p.m.