Triple

T475183
Position Surface form Disambiguated ID Type / Status
Subject Principles and Practice of Engineering exam E9045 entity
Predicate instanceOf P0 FINISHED
Object engineering examination C1466 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering examination
Context triple: [Principles and Practice of Engineering exam, instanceOf, engineering examination]
  • A. engineering journal
    An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
  • B. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • C. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • D. chemical engineer
    A chemical engineer is a professional who applies principles of chemistry, physics, mathematics, and engineering to design, optimize, and operate processes that transform raw materials into useful products safely, efficiently, and sustainably.
  • E. technical report
    A technical report is a structured document that presents methods, data, analysis, and conclusions about a specific technical or scientific investigation for a targeted audience.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7ff81708190b0507a24a997232c completed Feb. 28, 2026, 1:05 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.