Triple
T4661202
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sather Road |
E102534
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | campus road |
C5152
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: campus road Context triple: [Sather Road, instanceOf, campus road]
-
A.
campus roadway
chosen
A campus roadway is a designated vehicular and pedestrian circulation route within a campus that connects buildings, parking areas, and facilities while supporting safe, efficient movement and access.
-
B.
avenue
An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
-
C.
street
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
D.
university campus area
A university campus area is the designated physical environment of a university, encompassing academic buildings, student housing, recreational facilities, green spaces, and supporting infrastructure where educational and social activities occur.
-
E.
parkway
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43d823288190952279faa0d1d066 |
completed | March 20, 2026, 12:55 p.m. |
Created at: March 20, 2026, 1:15 p.m.