Triple

T4639207
Position Surface form Disambiguated ID Type / Status
Subject Westinghouse Savannah River Company E101609 entity
Predicate successorContractorAtSavannahRiverSite P23584 FINISHED
Object Savannah River Nuclear Solutions E100459 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Savannah River Nuclear Solutions | Statement: [Westinghouse Savannah River Company, successorContractorAtSavannahRiverSite, Savannah River Nuclear Solutions]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Savannah River Nuclear Solutions
Context triple: [Westinghouse Savannah River Company, successorContractorAtSavannahRiverSite, Savannah River Nuclear Solutions]
  • A. Savannah River Nuclear Solutions chosen
    Savannah River Nuclear Solutions is a U.S. government contractor responsible for managing and operating nuclear facilities and environmental cleanup activities at the Savannah River Site in South Carolina.
  • B. Westinghouse Savannah River Company
    Westinghouse Savannah River Company was a U.S. government contractor that managed and operated the Department of Energy’s Savannah River Site, focusing on nuclear materials production, environmental cleanup, and related research.
  • C. Savannah River Operations Office
    The Savannah River Operations Office is a U.S. Department of Energy field office responsible for overseeing nuclear materials management, environmental cleanup, and related operations at the Savannah River Site in South Carolina.
  • D. Savannah River National Laboratory
    Savannah River National Laboratory is a U.S. Department of Energy research facility in South Carolina specializing in nuclear materials management, environmental remediation, and national security technologies.
  • E. Savannah River Site
    Savannah River Site is a U.S. Department of Energy nuclear reservation in South Carolina historically used for producing materials for nuclear weapons and now focused on environmental cleanup and nuclear materials management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: successorContractorAtSavannahRiverSite
Context triple: [Westinghouse Savannah River Company, successorContractorAtSavannahRiverSite, Savannah River Nuclear Solutions]
  • A. successorAgencyFunction
    Indicates that one agency has taken over or continues the functions, responsibilities, or roles previously carried out by another agency.
  • B. successorBuildingOnSite
    Indicates that one building directly replaces another on the same physical site or location.
  • C. successorFacility chosen
    Indicates that one facility directly follows and replaces another in function, ownership, or operation.
  • D. successorEngine
    Indicates that one engine directly follows and replaces another in a sequence or version lineage.
  • E. successorInPractice
    Indicates that one entity has taken over the role, position, or function of another in actual practice, even if not formally or officially designated as its successor.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d3bc7c81908f81fcf380476b0f completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd5a8e0ee88190becab97d2ef1571a completed March 20, 2026, 2:32 p.m.
NED1 Entity disambiguation (via context triple) batch_69be103799108190a905c28cdf302aba completed March 21, 2026, 3:27 a.m.
PD Predicate disambiguation batch_69bd5234d24c819095c79890b70eff9a completed March 20, 2026, 1:57 p.m.
Created at: March 20, 2026, 1:13 p.m.