Triple

T4626659
Position Surface form Disambiguated ID Type / Status
Subject Venice Production Bridge E101113 entity
Predicate instanceOf P0 FINISHED
Object industry platform C15224 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: industry platform
Context triple: [Venice Production Bridge, instanceOf, industry platform]
  • A. Supply-side platform
    A supply-side platform is a technology system that helps digital publishers manage, optimize, and automate the selling of their advertising inventory across multiple ad exchanges and demand sources.
  • B. digital platform chosen
    A digital platform is an online infrastructure that facilitates interactions, transactions, or value exchange between users, services, or systems through integrated digital tools and interfaces.
  • C. Internet of Things platform
    An Internet of Things platform is an integrated software and hardware environment that connects, manages, and analyzes data from distributed IoT devices to enable monitoring, control, and automation of physical systems.
  • D. automotive platform
    An automotive platform is a shared, standardized set of structural, mechanical, and electronic components that underpins multiple vehicle models to streamline development, reduce costs, and enable design flexibility.
  • E. middleware platform
    A middleware platform is a software layer that sits between applications and underlying systems to provide common services, integration, and communication capabilities across distributed environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d0497c8190ac23c65c5804846a completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:13 p.m.