Triple

T4625465
Position Surface form Disambiguated ID Type / Status
Subject Alcázar de San Juan E101086 entity
Predicate railwayJunctionOn P14465 FINISHED
Object Madrid–Alicante railway
The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
E463828 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madrid–Alicante railway | Statement: [Alcázar de San Juan, railwayJunctionOn, Madrid–Alicante railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Madrid–Alicante railway
Context triple: [Alcázar de San Juan, railwayJunctionOn, Madrid–Alicante railway]
  • A. Madrid–Valencia railway
    The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
  • B. Madrid–Andalusia railway
    The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
  • C. Madrid–Barcelona railway
    The Madrid–Barcelona railway is a major Spanish rail line linking the capital Madrid with the northeastern city of Barcelona, serving as one of the country’s principal passenger and freight corridors.
  • D. Valença–Tui rail link
    The Valença–Tui rail link is an international railway connection between Portugal and Spain, crossing the Minho River between the towns of Valença and Tui.
  • E. Madrid–Valencia road
    The Madrid–Valencia road is a major Spanish highway that connects the capital city of Madrid with the Mediterranean port city of Valencia, serving as a key route for both regional and long-distance traffic.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Madrid–Alicante railway
Triple: [Alcázar de San Juan, railwayJunctionOn, Madrid–Alicante railway]
Generated description
The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Madrid–Alicante railway
Target entity description: The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
  • A. Madrid–Valencia railway
    The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
  • B. Madrid–Andalusia railway
    The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
  • C. Madrid–Barcelona railway
    The Madrid–Barcelona railway is a major Spanish rail line linking the capital Madrid with the northeastern city of Barcelona, serving as one of the country’s principal passenger and freight corridors.
  • D. Valença–Tui rail link
    The Valença–Tui rail link is an international railway connection between Portugal and Spain, crossing the Minho River between the towns of Valença and Tui.
  • E. Madrid–Valencia road
    The Madrid–Valencia road is a major Spanish highway that connects the capital city of Madrid with the Mediterranean port city of Valencia, serving as a key route for both regional and long-distance traffic.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d0497c8190ac23c65c5804846a completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd6234e8108190b985270b9ddd1f3a completed March 20, 2026, 3:05 p.m.
NED1 Entity disambiguation (via context triple) batch_69be102eb0048190bebc8a92a5338b83 completed March 21, 2026, 3:27 a.m.
NEDg Description generation batch_69be138d09888190845d4860b3880f1b completed March 21, 2026, 3:42 a.m.
NED2 Entity disambiguation (via description) batch_69be13e813e08190842ad5c2ad8e47cc completed March 21, 2026, 3:43 a.m.
Created at: March 20, 2026, 1:13 p.m.