Triple
T4625463
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alcázar de San Juan |
E101086
|
entity |
| Predicate | railwayJunctionOn |
P14465
|
FINISHED |
| Object | Madrid–Seville railway |
E375387
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madrid–Seville railway | Statement: [Alcázar de San Juan, railwayJunctionOn, Madrid–Seville railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Madrid–Seville railway Context triple: [Alcázar de San Juan, railwayJunctionOn, Madrid–Seville railway]
-
A.
Madrid–Andalusia railway
chosen
The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
-
B.
Madrid–Barcelona railway
The Madrid–Barcelona railway is a major Spanish rail line linking the capital Madrid with the northeastern city of Barcelona, serving as one of the country’s principal passenger and freight corridors.
-
C.
Valença–Tui rail link
The Valença–Tui rail link is an international railway connection between Portugal and Spain, crossing the Minho River between the towns of Valença and Tui.
-
D.
Mediterranean high-speed line
The Mediterranean high-speed line is a French high-speed railway corridor that extends the TGV network from the Rhône Valley toward the Mediterranean coast, significantly reducing travel times to cities like Marseille.
-
E.
Madrid–Valencia road
The Madrid–Valencia road is a major Spanish highway that connects the capital city of Madrid with the Mediterranean port city of Valencia, serving as a key route for both regional and long-distance traffic.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: railwayJunctionOn Context triple: [Alcázar de San Juan, railwayJunctionOn, Madrid–Seville railway]
-
A.
railwayJunctionFor
Indicates that a location serves as a junction point where multiple railway lines or routes connect or intersect for a given railway network or service.
-
B.
transportationJunctionFor
Indicates a location that serves as a connecting point where multiple transportation routes or modes meet, intersect, or transfer.
-
C.
terminusJunction
Indicates a relationship where a route, line, or path ends at a junction point that serves as its terminal connection.
-
D.
junctionStation
chosen
Indicates that a station functions as a junction where multiple routes or lines intersect or connect.
-
E.
nearJunctionOf
Indicates that one entity is located close to the point where two or more linear features (such as roads, tracks, or paths) meet or intersect.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43d0497c8190ac23c65c5804846a |
completed | March 20, 2026, 12:55 p.m. |
| NER | Named-entity recognition | batch_69bd5a08ef488190af46418229309b0f |
completed | March 20, 2026, 2:30 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69bdfaa564988190b565c26b9cd3d3be |
completed | March 21, 2026, 1:55 a.m. |
| PD | Predicate disambiguation | batch_69bd5231db7c8190b38d4fdbad8bf842 |
completed | March 20, 2026, 1:57 p.m. |
Created at: March 20, 2026, 1:13 p.m.