Triple
T4622101
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Auckland Harbour Bridge |
E101009
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cantilever truss bridge |
C2689
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cantilever truss bridge Context triple: [Auckland Harbour Bridge, instanceOf, cantilever truss bridge]
-
A.
cantilever bridge
chosen
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
-
B.
truss bridge
A truss bridge is a type of bridge whose load-bearing superstructure is composed of a framework of interconnected triangular units that efficiently distribute forces through tension and compression.
-
C.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
D.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
E.
cable-stayed bridge
A cable-stayed bridge is a type of bridge in which the deck is directly supported by multiple cables connected to one or more towers or pylons, efficiently distributing loads and allowing for long spans with a distinctive, fan-like or harp-like appearance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43d0497c8190ac23c65c5804846a |
completed | March 20, 2026, 12:55 p.m. |
Created at: March 20, 2026, 1:12 p.m.