Triple
T462184
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ROMA Design Group |
E7362
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban design firm |
C2818
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban design firm Context triple: [ROMA Design Group, instanceOf, urban design firm]
-
A.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
B.
urban business district
An urban business district is a densely developed area within a city characterized by a high concentration of offices, commercial activities, financial institutions, and supporting services that form the economic core of the urban environment.
-
C.
architect
An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
-
D.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
E.
urban park
An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e7e5c5bc8190a1dc8178218fba40 |
completed | Feb. 28, 2026, 1:04 p.m. |
Created at: Feb. 28, 2026, 1:12 p.m.