Triple
T4616654
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Plan-Do-Check-Act cycle |
E100883
|
entity |
| Predicate | PlanPhaseIncludes |
P22825
|
FINISHED |
| Object | setting objectives |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: setting objectives | Statement: [Plan-Do-Check-Act cycle, PlanPhaseIncludes, setting objectives]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: PlanPhaseIncludes Context triple: [Plan-Do-Check-Act cycle, PlanPhaseIncludes, setting objectives]
-
A.
programPhase
chosen
Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
-
B.
hasPlanningStatus
Indicates that an entity is associated with a particular stage, condition, or outcome in a planning or approval process.
-
C.
hasPhaseRelation
Indicates that two entities are related by a specific phase difference or phase alignment in time or a cyclical process.
-
D.
constructionPhase
Indicates the specific stage or period an entity is in within an overall construction or building process.
-
E.
plannedWith
Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43cf363c819087fd5ab441b4a3f4 |
completed | March 20, 2026, 12:55 p.m. |
| NER | Named-entity recognition | batch_69bd59df3c3c8190be5db000f831d322 |
completed | March 20, 2026, 2:29 p.m. |
| PD | Predicate disambiguation | batch_69bd522fd5c48190ad2bffc0a5bc9061 |
completed | March 20, 2026, 1:57 p.m. |
Created at: March 20, 2026, 1:12 p.m.