Triple

T4616654
Position Surface form Disambiguated ID Type / Status
Subject Plan-Do-Check-Act cycle E100883 entity
Predicate PlanPhaseIncludes P22825 FINISHED
Object setting objectives LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: setting objectives | Statement: [Plan-Do-Check-Act cycle, PlanPhaseIncludes, setting objectives]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: PlanPhaseIncludes
Context triple: [Plan-Do-Check-Act cycle, PlanPhaseIncludes, setting objectives]
  • A. programPhase chosen
    Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
  • B. hasPlanningStatus
    Indicates that an entity is associated with a particular stage, condition, or outcome in a planning or approval process.
  • C. hasPhaseRelation
    Indicates that two entities are related by a specific phase difference or phase alignment in time or a cyclical process.
  • D. constructionPhase
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • E. plannedWith
    Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cf363c819087fd5ab441b4a3f4 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd59df3c3c8190be5db000f831d322 completed March 20, 2026, 2:29 p.m.
PD Predicate disambiguation batch_69bd522fd5c48190ad2bffc0a5bc9061 completed March 20, 2026, 1:57 p.m.
Created at: March 20, 2026, 1:12 p.m.