Triple

T4616615
Position Surface form Disambiguated ID Type / Status
Subject Plan-Do-Check-Act cycle E100883 entity
Predicate instanceOf P0 FINISHED
Object management methodology C16100 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: management methodology
Context triple: [Plan-Do-Check-Act cycle, instanceOf, management methodology]
  • A. management book
    A management book is a non-fiction work that provides theories, strategies, and practical guidance for planning, organizing, leading, and controlling people and resources in organizations.
  • B. management consultant
    A management consultant is a professional who analyzes organizations’ operations and strategies to provide expert advice and solutions that improve performance, efficiency, and overall business outcomes.
  • C. software development methodology
    A software development methodology is a structured framework of principles, practices, and processes that guides how software is planned, designed, built, tested, and delivered.
  • D. project management tool
    A project management tool is a software application that helps plan, organize, track, and collaborate on tasks and resources to achieve project goals efficiently.
  • E. package management system
    A package management system is a tool that automates the processes of finding, installing, upgrading, configuring, and removing software packages and their dependencies in a consistent and reliable way.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cf363c819087fd5ab441b4a3f4 completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:12 p.m.