Triple

T4607125
Position Surface form Disambiguated ID Type / Status
Subject K Reactor E100464 entity
Predicate instanceOf P0 FINISHED
Object nuclear production reactor C2095 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear production reactor
Context triple: [K Reactor, instanceOf, nuclear production reactor]
  • A. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • B. plutonium production reactor chosen
    A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
  • C. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • D. dual-purpose reactor
    A dual-purpose reactor is a nuclear reactor designed to simultaneously produce electrical power and another output, such as process heat or weapons-grade materials.
  • E. graphite-moderated nuclear reactor
    A graphite-moderated nuclear reactor is a type of nuclear fission reactor that uses graphite as a neutron moderator to slow down fast neutrons, enabling sustained chain reactions in its fuel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cce1e08190a07d53af6a9b6c24 completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:12 p.m.